Completed Projects

Project: Water Supply Structures Construction and Supervision Training ( Ferro Cement Tank Construction) for WASH Technician (WT) Implementation Phase of Batch X – Package 4 

Working areas: Mid and Far Western Region

Client: RWSSFDB

Year: September 13, 2017 to October 31, 2017

Service Amount: NRs 3,775,612.50

Project: Adaptation for Smallholders in Hilly Area (ASHA): Baseline Survey and Vulnerability  Assessment (DV Nepal, JV with PSPL, ETA Consult Pvt. Ltd.)

Working Areas: 6 ASHA target Districts of Nepal

Client: MoFSC GoN and IFAD

Year: October, 2016 to May, 2017

Service Amount: NRs. 43,21,572.002 

Project: To Prepare Implementation Guideline and Manual for Jagaran

Working Areas: Nepal

Client: RWSSFDB

Year: October  2016 to January  2017

Service Amount: NRs. 15,65,050.00

Project: Orientation on Community Action Planning (CAP), Health Hygiene and Sanitation (HHS), ODF/Post ODF for SO’s staffs WASH Technicians (WT), WASH Motivators (WM) and WASH Trigger (WT) in Development Phase of Batch X ( RWSSIP/S/FBS-022), Package-5

Working areas: Central and Western Regions

Client: RWSSFDB

Year: 27 December 2016 to 26 January 2017

Service Amount: NRs 8,999,885.00

Project: Orientation on Community Action Planning (CAP), Health Hygiene and Sanitation (HHS), ODF/Post ODF for SO’s staffs WASH Technicians (WT), WASH Motivators (WM) and WASH Trigger (WT) in Development Phase of Batch X ( RWSSIP/S/FBS-022), Package-4

Working areas: Mid and Far Western Regions

Client: RWSSFDB

Year: 27 December 2016 to 26 January 2017

Service Amount: NRs.8,999,885.00

Annapurna Conservation Area (ACA) Impact Study

The study is to assess the social and environmental impacts of Management interventions made by NTNC through its ACA  project between 1986 and 2013;

Impact assessment report of ACA covering the socio – economic, biodiversity, land use change, community’s capacity building and tourism management as a means of financing conservation and sustainable development

A final report highlighting the major interventions undertaken, their impacts in terms of biodiversity conservation, socioeconomic status improvements of the local communities    and lessons learned together with future suggestions if any.

Working Areas: Western Regions (Lamjung, Myagdi, Kaski, Mustang & Manang districts)

Client/Fund: National Trust for Nature Conservation (NTNC)

Work Started: April 2014

Work Completed: April 2015 

Service Amount: Npr. 14,89,340.00

Establishment of Entity

Facilitation of the Process of the Establishment of National Forestry Entity (NFE).

This project is to provide facilitation and write up support for the establishment of NFE within the Ministry of Forest and Soil Conservation (MFSC) following existing legal and operational procedure of the Government of Nepal.

Facilitate to establish NFE as an autonomous, multi-stakeholder institution by clearly defining institutional mandates and responsibilities

Suggest for appropriate legal mechanism for the establishment of the NFE without undermining the role of government or MFSC.

Develop standard operational procedure and business plan of the NFE.

Working Areas: Nepal

Client/Fund: Multi-Stakeholder Forestry Programme (MSFP)

Work Started: 6thJuly 2014

Work Completed: 15thApril 2105

Service Amount: Npr. 5,558,922.00

Community Action Planning / Health, Hygiene and Sanitation including Conflict Management Training to CWs and CTs of Batch IX New SOs , Package- 4 ( RFP 157)

This assignment is to train SO’s staff (Community Worker and Community Technician) to effectively assist communities to prepare their CAP; to be aware of health hygiene and   sanitation needs/benefits and also to be able to manage conflict in the communities.

Working Areas: Mid-Far Western Region

Client/Fund: RWSSFDB/ IDA Credit and Grant

Work Started:  25th June 2012

Work Completed: 23rdJuly 2012

Service Amount: Npr. 3,491,700.00

Material Quality Spot Check in Implementation Phase Schemes under Batch-VIII (Schemes 30), Package-1 (RFP 144)

Working Areas: Western, Mid Western and Far Western Regions

Client/Fund: RWSSFDB/ IDA Credit and Grant

Work Started:  May 2011

Work Completed: August 2011

Service Amount: Npr. 673,678.50

Monitoring and Evaluation of Batch –VII,VIII, IX(3rd payment M&E visit for B-VII development Phase, 41 schemes); 2nd and 3rd payment M&E visit for batch-VII implementation phase 82 schemes); 2nd and 3rd payment M&E visit for B-VIII development phase 114 schemes ); PF site Appraisal visit for B-VIII and IX schemes 153 schemes); Design check and finalization B-VIII 57 schemes), 2nd and 3rd payment M&E visit for Batch VIII implementation phase-114 schemes

Working Areas:, Mid-Western Region

Client/Fund: RWSSFDB/ IDA Credit and Grant

Work Started:  July 2009

Work Completed: February 2012

Service Amount: Npr. 7,815,120.00

To Provide Service for Procurement and Financial, External Monitoring and Evaluation related activities

Working Areas: Nepal

Client/Fund: Skills for Employment Projects, CTEVT

Work Started:  6thJuly 2010

Work Completed: February 2012

Service Amount: Npr. 1,960,400.00

Consultancy Services for Rural Transport Study and Policy Development

JV with MEH Consults (Pvt) Ltd., RIDC (Pvt) Ltd., GEC (Pvt) Ltd.,and ETA Consult (Pvt) Ltd.

Working Areas: Kathmandu

Client/Fund: Rural Access Improvement Decentralize Project (RAIDP), DoLIDAR

Work Started:  March 2009

Work Completed: October 2010

Service Amount: Npr. 8,407,800.00

Community Action Planning(CAP)/Health, Hygiene and Sanitation including Conflict Management Training to CWs and CTs of Batch IX SOs- Package-5 (4 Groups)

This assignment is to train SO’s staff (Community Worker and Community Technician) to effectively assist communities to  prepare their CAP; to be aware of health hygiene and   sanitation needs/benefits and also to be able to manage conflict in    the  communities.

Working Areas: Eastern/Central/Western/Mid/Far Western

Client/Fund: RWSSFDB/ IDA Credit and Grant

Work Started:  25thNovember 2011

Work Completed: 26th December 2011

Service Amount: Npr. 3,586,925.00

Community Action Planning(CAP)/Health, Hygiene and Sanitation including Conflict Management Training to CWs and CTs of Batch IX SOs-Package-2, (4-Groups)

This assignment is to train SO’s staff (Community Worker and Community Technician) to effectively assist communities to prepare their CAP; to be aware of health hygiene and sanitation needs/benefits and also to be able to manage conflict in the communities.

Working Areas: Eastern/Central/Western/Mid/Far Western

Client/Fund: RWSSFDB/ IDA Credit and Grant

Work Started:  25thNovember 2011

Work Completed: 26th December 2011

Service Amount: Npr. 3,900,590.00

Long-Term Sustainability Study of Batch -IV Schemes

(ETA  Consult JV with MEH Consultants (P) Ltd

The scope of the assignment covers a fairly representative and unbiased sample of 108% schemes (at least one schemes of each SO) selected from 355 completed schemes of Batch-III. Assessed the status of WSUC representing the gender, caste,   ethnic composition and regularity of meetings, decision making process. Assessed involvement of the participating community in planning, implementation, operation and maintenance of the scheme and decision making process. Assessed participation of    poor, IP/Dalit and disadvantaged groups in decision making process and their access to   drinking water and sanitation.

Working Areas: Nepal

Client/Fund: RWSSFDB/ IDA Credit and Grant

Work Started:  25thNovember 2011

Work Completed: 8th February 2012

Service Amount: Npr. 3,586,925.00

Immediate Impact Study of Community Development including Health and Sanitation Activities under Batch-VI SOs (RFP 137)

The CDA impact study has conducted in around 70 schemes out of the total 341 schemes of Batch- VI (around 20% of the total schemes of batch – VI) 

Assessment of identification strategies on the basis of demand responsiveness and effectiveness of such strategies in reaching these communities; and specific groups such as women, children, older people, marginal groups, IP/Dalits etc.

Review and assessment of combined impacts of community action planning, training and capacity building, health and sanitation education on different.

Working Areas: Nepal

Client/Fund: RWSSFDB/ IDA Credit and Grant

Work Started:  March 18, 2011

Work Completed: June 17, 2011

Service Amount: Npr. 1,739,189.25

Basic Foreman Plumbing Training to Community Technicians of Batch VIII-SOs (Package 4) (RFP 139)

This assignment is to provide basic knowledge in WSS to CTs of different SOs. This basic foreman training aims to develop the technical and software skills of the CTs for progress reporting on physical outputs, community mobilization and construction of gravity flow water supply and sanitation systems.

Working Areas: Mid and Far Western Region

Client/Fund: RWSSFDB

Work Started:  March, 2011

Work Completed: May, 2011

Service Amount: Npr. 2,347,232.00

Water (Ferro Cement) Tank Construction Training to Community Technicians of Batch VIII SOs (Package-4)

This assignment is to provide water (Ferro cement) tank construction training to the CTs of different SOs to import knowledge and skills on the construction of water supply and sanitation schemes. This training aims to develop the technical and software skills of the CTs for the construction of water (Ferro cement) tank of different types of water tank supply and sanitation systems including community development activities.

Working Areas: Mid and Far Western Region

Client/Fund: RWSSFDB

Work Started:  March, 2011

Work Completed: May, 2011

Service Amount: Npr. 1,387,361.00

Preparation of WASH Plan in Hanspur and Dangwang VDC, Pyuthan

Working Areas: Mid-Western Region

Client/Fund: DDC Pyuthan

Work Started:  January 2010

Work Completed: April 2010

Service Amount: Npr. 983,400.00

Training program on CAP/HHS including Conflict Management for Community Workers (CWs) and Community technicians (CTs), Batch-VIII, Package-5, (4 Groups)

Working Areas: Mid and Far Western Region

Client/Fund: RWSSFDB

Work Started:  06 September 2009

Work Completed: 05 October 2009

Service Amount: Npr. 3,243,412.80

Ferro cement tank construction Training for Batch VII package-2, RFP 129

This assignment is to provide water (Ferro cement) tank construction training to the CTs of different SOs to import knowledge and skills on the construction of water supply and sanitation schemes. This training aims to develop the technical and software skills of the CTs for the construction of water (Ferro cement) tank of different types of water tank supply and sanitation systems including community development activities.

Working Areas: Pyuthan

Client/Fund: RWSSFDB

Work Started:  05 June 2009

Work Completed: 20 July 2009

Service Amount: Npr. 1,174,759.30

Monitoring and Evaluation of Batch V, VI, and VII Schemes (Batch-IV Implementation Phase and Batch-V Pre- Development phase 71 schemes, Pre- feasibility site- Appraisal Batch-VI 92 schemes, Compliance and Process monitoring and evaluation of Batch V and Batch VI, Compliance and Process monitoring and evaluation of Batch VI and Batch VII Dev. phase pre-feasibility assessment and site appraisal of Batch-VII schemes, Finalization of design estimate of schemes as part of Implementation Phase proposal of Batch VI, Construction  Material Quality Spot checking Of Batch V and VI and Pre-Feasibility Site Appraisal of Batch VIII and IX Schemes) (Total person man months 148)

Working Areas: Mid-Western Region

Client/Fund: RWSSFDB

Work Started:  September 2006

Work Completed: April 2009

Service Amount: Npr. 7,498,455.82

Training on Ferro Cement Tank Construction to Community Technicians of Batch-VI SOs (Package-2): Central-Western Region (17 days)

This assignment is to provide water (Ferro cement) tank construction training to the CTs of different SOs to import knowledge and skills on the construction of water supply and sanitation schemes. This training aims to develop the technical and software skills of the CTs for the construction of water (Ferro cement) tank of different types of water tank supply and sanitation systems including community development activities.

Working Areas: Khairenitar, Tanahu

Client/Fund: RWSSFDB

Work Started:  June 1, 2008

Work Completed: July 10, 2008

Service Amount: Npr. 924,667.70

Training program on CAP/HHS including Conflict Management for Community Workers (CWs) and Community technicians(CTs), of SOs Staff for Batch-VII (17 days)-2 Groups, RFP 117

This assignment is to train SO’s staff (Community Worker and Community Technician) to effectively assist communities to prepare their CAP; to be aware of health hygiene and   sanitation needs/benefits and also to be able to manage conflict in the communities.

Working Areas: Narayanghat

Client/Fund: RWSSFDB

Work Started:  September 19, 2006

Work Completed: October 2007

 Service Amount: Npr. 1,159,097.00

Training Program on Rural Water Supply Scheme Design and Supervision for Technical Supervisor Batch VI (10 days)

This assignment is to orient Technical Supervisor on water supply and sanitation scheme survey, design, estimate and supervision based on design guideline and technical manual of the Board in conjunction/ participation with community. Participants will also orient on the design and estimate software (WatSanApp).

Working Areas: Chitwan, Nepalgunj

Client/Fund: RWSSFDB

Work Started:  December 24, 2006

Work Completed: January 29, 2007

Service Amount: Npr. 636,077.00

Training program on CAP/HHS including Conflict Management for Community Workers (CWs) and Community technicians(CTs), Batch-VI (17 days)-4 Groups

This assignment is to train SO’s staff (Community Worker, Community Technician, Software Supervisor, Field Coordinator and the Team Leader) to effectively assist communities to prepare their CAP; to be aware of health hygiene and sanitation needs/benefits and also to be able to manage conflict in the communities.

Working Areas: Narayanghat

Client/Fund: RWSSFDB

Work Started:  September, 2006

Work Completed: December, 2006

Service Amount: Npr. 1,546,970.00

IEE, Feasibility and detail Survey and Study of Lapcha – Limi – Takchi Simikot Road (Kailash Darshan Marg)

Working Areas: Humla

Client/Fund: Ministry of Local Development Office of DDC

Year: 2006

Service Amount: Npr. 2,039,650.00

Refresher Training to Community Worker of Batch-V SOs

This assignment is to provide refresher training to the community workers of different SOs and provide facilitation capacity to implement CAP and HHSA. This training aims to sharp the role of CWs to facilitate community to achieve the objectives of CDA, CAP component including the HHSA.

Working Areas: Nepalgunj

Client/Fund: RWSSFDB

Work Started:  May, 2006

Work Completed: June, 2006

Service Amount: Npr. 237,300.00

Basic Foreman Training to Community Technicians of Batch-V SOs

This assignment is to provide basic knowledge in water supply and sanitation to Community Technicians (CTs) of different SOs. This basic foreman training aims to develop the technical and software skills of the CTs for progress reporting on physical outputs, community motivation and construction of gravity flow water supply and sanitation systems.

Working Areas: Nepalgunj

Client/Fund: RWSSFDB

Work Started:  May, 2006

Work Completed: July, 2006

Service Amount: Npr. 645,196.10

Detail Design Review of Bhandara Bridge along Katari Okhaldhunga Road

Working Areas: Okhaldhunga

Client/Fund: Department of Road

Work Started:  June, 2005

Work Completed: August, 2005

Service Amount: Npr. 96,000.00

Compliance and Process Monitoring and Evaluation of Dev. Phase, Material Quality Spot check, Finalization of Design estimate of Batch-V schemes and Pre-feasibility assessment and Site Appraisal of Batch-VI schemes

The objectives of the monitoring visit are to monitor the progress in the schemes, material quality check, finalization design estimate and PF site appraisal of the schemes.

Working Areas: Central, Mid-Western and Far-Western Regions

Client/Fund: RWSSFDB

Work Started:  December, 2002

Work Completed: June, 2005

Service Amount: Npr. 5,386,852.99

Training Program on Rural Water Supply Scheme Design and Supervision for Technical Supervisor Batch V (10 days)

Working Areas: Chitwan, Nepalgunj

Client/Fund: RWSSFDB

Year: 2004

Service Amount: Npr. 812,914.30

17 days Training on Community Action Planning, Health Hygiene Sanitation including Conflict Management for Community Workers (CW), Community Technician (CT) and 7 days Training on CAP/HHS including conflict management for Team Leader (TL), Software Supervisor (SS)

This assignment is to train SO’s staff (Community Worker and Community Technician) to effectively assist communities to prepare their CAP; to be aware of health hygiene and sanitation needs/benefits and also to be able to manage conflict in the communities.

Working Areas: Chitwan, Nepalgunj

Client/Fund: RWSSFDB                                                                                                                  

Year: 2004

Service Amount: Npr. 1,636,056.13

Rapid Assessment Survey of Physical Learning Environment of All Lower and Secondary Schools in 4 PID

Working Areas: Jumla, Baitadi, Rupandehi and Kailali

Client/Fund: Education Advisory Team                                                                                          

Year: 2004

Service Amount: Npr. 902,526.90

17 Days Training on Community Action Planning, Health Hygiene Sanitation including conflict Management for Community Workers (CW), Community Technician (CT), 7 days Training on CAP/HHS including conflict management for Team Leader (TL), Software Supervisor (SS) and 3 days Refresher’s Training on CAP/HHS with conflict management for TL, SS of Batch V Schemes

This assignment is to train SO’s staff (Community Worker and Community Technician, Software Supervisor, Team Leader) to effectively assist communities to prepare their CAP; to be aware of health hygiene and sanitation needs/benefits and also to be able to manage conflict in the communities.Conflict in the communities.

Working Areas: Kathmandu

Client/Fund: RWSSFDB                                                                                                                  

Work Started:  June 2004

Work Completed: July 2004

Service Amount: Npr. 1,639,326.15

Labor Availability Survey of Balubang – Pyuthan Road

Recruit and train enumerators

Survey, Supervise and Monitor

Compile data and

Recommend

Working Areas: Balubang-Pyuthan Road

Client/Fund: RAP/ District Development Committee, Pyuthan

Year: 2004

Service Amount: Npr. 316,800.00

Labor Availability Survey of Hille-Bhanjyang-Dingla District Road Corridor

Recruit and train enumerators

Survey, Supervise and Monitor

Compile data and

Recommend

Working Areas: Hille-Bhanjyang-Dingla District Road Corridor, Bhojpur

Client/Fund: RAP/ District Development Committee, Bhojpur

Work Started:  February 2004

Work Completed: March 2004

Service Amount: Npr. 410,550.00

Final Evaluation of the JRC/RCY Drinking Water and Sanitation Program

Working Areas: 43 districts, 103 Schemes

Client/Fund: Nepal Red Cross Society, Junior/Youth Red Cross Drinking Water Program

Year: 2003

Service Amount: Npr. 212,575.00

Rehabilitation of JAKPAS and RWSSFDB Schemes

The SA is required to conduct the site appraisal of the schemes and verify need of the rehabilitation reports submitted by the SOs in order to enable the Fund Board to pre-qualify and carryout the rehabilitation of the schemes.

Working Areas: 21 Schemes of different districts

Client/Fund: RWSSFDB

Work Started:  June 2003

Work Completed: July 2003

Service Amount: Npr. 217,717.77

Orientation Program on Pre-feasibility Study for Support Organization and Service Agency

Working Areas: Kathmandu

Client/Fund: RWSSFDB

Work Started:  June 2003

Work Completed: July 2003

Service Amount: Npr. 365,380.68

Process and compliance monitoring of Batch-IV schemes and pre-feasibility site appraisal of Batch-V schemes of Rural Water Supply and Sanitation Fund Development Board.

The objectives of the monitoring visit are to monitor the progress in the schemes (Implementation Phase of Batch IV and Development phase of Batch V schemes), material quality check (Batch V), finalization design estimate (Batch V), and PF site appraisal (Batch VI) schemes, 2nd Payment monitoring 71; 3rd payment monitoring 71; PF site appraisal Batch V 80; M&E Visit of Batch V Development Phase; 2 Payment monitoring 26; 3rd payment monitoring 45; PF Site Appraisal Batch VI 91; Finalization of Design Estimate of Batch V 45 and Material Quality sport checking of Batch V.

Working Areas: 12 different districts

Client/Fund: RWSSFDB

Work Started:  Dec 23, 2003

Work Completed: June 30, 2005

Service Amount: Npr. 5,386,825.99

Bare Foot Technical Training on Basic Electric Installation for Employment

Working Areas: Kathmandu

Client/Fund: Plan Nepal, Bara/Rautahat Program in association with TFE

Year: 2002

Service Amount: Npr. 250,000.00                                               

Preparation of District Periodic Plan (DPP) of Bardiya District

Working Areas: Bardyia

Client/Fund: ADDCN

Year: 2002

Service Amount: Npr. 339,650.00

Preparation of District Periodic Plan (DPP) of Nuwakot District

Working Areas: Nuwakot

Client/Fund: ADDCN

Year: 2002

Service Amount: Npr. 339,650.00

36 days Basic Foreman Plumbing Training (1 Package), 18 days Cement Tank Construction Training (2 Packages)

Working Areas: Nawalparasi

Client/Fund: RWSSFDB

Work Started:  April 2002

Work Completed: June 2002

Service Amount: Npr. 973,610.00

Preparation of District Transport Master Plan (DTMP) of Bara District

Working Areas: DDC, Bara

Client/Fund: Plan Nepal, Bara/Rautahat Program in association with TfE

Years: 2001/2002

Service Amount: Npr. 344,400.00

Design and Construction Supervision work of Community Managed Emergency Maternity Home

Working Areas: Nigadh, Bara

Client/Fund: Plan International Nepal, Bara/Rautahat Program

Years: 2001/2002

Service Amount: Npr. 467,014.80

7 days Supervisory Training for Technical Human Resources of Community Based Infrastructure Projects for    Overseer/Sub overseer of PLAN International Bara, Rautahat, Banke, Bajhang, Morang, Sunsari Program

 Working Areas: Kathmandu

 Client/Fund:Different program units of PLAN Nepal

 Year: 2001

Service Amount: Npr. 120,000.00

Impact Study of Implemented Water Supply and Sanitation Projects

Working Areas: Bara, Rautahat

Client/Fund: Plan International Nepal, Bara/Rautahat Program

Year: 2001

Service Amount: Npr. 200,000.00

Sustainable Water Supply and Sanitation Program, Tube Well Operation and Maintenance Training to WUGs/WUCs and Pit Latrine Construction

Working Areas: Bara, Rautahat

Client/Fund: Plan Intermational Nepal, Bara/Rautahat Program

Year: 2001

Service Amount: Npr. 605,000.00

Sustainable Water Supply and Sanitation Program, CBO Training on Water and Sanitation (6 Groups) and Tubewell Operation and Maintenance Training to WUGs/WUCs

Working Areas: Banke

Client/Fund: Plan International Nepal, Banke Program

Year: 2001

Service Amount: Npr. 632,000.00

Design, Estimate and Supervision for Drinking Water and Sanitation Project Funded by FINNIDA for Argakhanchi

Working Areas: Argakhanchi

Client/Fund: DDC/FINNIDA, Argakhanchi

Year: 2000/2001

Service Amount: Npr. 460,000.00

3 days Refresher Training on Basic Health and Sanitation Education and Community Action Planning for CWs Batch III

Working Areas: Bharatpur, Chitwan

Client/Fund: RWSSFDB

Work Started:  October, 2000

Work Completed: November, 2000

Service Amount: Npr. 133,432.00

3 days, WSS Strategy Workshop for NGO Engineers and Overseers of Dadeldhura, Baitadi and Jumla to Develop WSS Implementation and Maintenance Strategy; WUC and WUGs Training Packages

Working Areas: Dadeldhura, Baitadi, Jumla

Client/Fund: CECI/CBED, CECI/CHI

Year: 1999

Service Amount: Npr. 125,000.00

14 Days Training for Infrastructure Technicians for SNV/DDC Project

Working Areas: Illam

Client/Fund: SNV/Illam

Year: 1999

Service Amount: Npr. 170,000.00

21 days Ferro cement Mason Training to Community Workers for Community Based Water Projects of Dadeldhura and Baitadi (2 Packages)

Working Areas: Dadeldhura and Baitadi

Client/Fund: CECI/CBED, CECI/CHI

Year: 1999

Service Amount: Npr. 125,000.00

14 Days Plumber Training to Community Workers for Community Based Water Projects of Jumla, Dadeldhura and Baitadi (3 Packages)

Working Areas: Dadeldhura, Baitadi, Jumla

Client/Fund: CECI/CBED, CECI/CHI

 Year: 1999

Service Amount: Npr. 125,000.00

Study on Sustainable Aspects of Implemented Water Supply and Sanitation Projects

Working Areas: Dadeldhura and Baitadi

Client/Fund: CECI/CBED, CECI/CHI

Year: 1999

Service Amount: Npr. 600,000.00

Supervision and Monitoring of Tube-well Installation, Develop and Conduct Hygiene and Sanitation Education (HSE) and Water Quality Assessment

Working Areas: Bara, Rautahat

Client/Fund: Plan International Nepal, Bara/Rautahat Program

Year: 1999

Service Amount: Npr. 254,120.00

Conduct CBO Training on Water and Sanitation and Masonry Training to Community Members with Manual Preparation

Working Areas: Bara, Rautahat

Client/Fund: Plan International  Nepal, Bara/Rautahat Program

Year: 1999

Service Amount: Npr. 351,000.00

Detail Feasibility Study with complete design package for new 9 VDCs of Dadeldhura, 8 VDCs of Baitadi and 16 VDCs of Jumla

Working Areas: Baitadi, Jumla, Dadeldhura District

Client/Fund: CECI/CBED

Year: 1999

Service Amount: Npr. 525,000.00

7 Days Training on WSS Strategy Formulation and Approach for NGOs Engineer/Overseers/Sub overseer of Dadeldhura, Baitadi, Jumla 

Working Areas: Dadeldhura, Baitadi, Jumla

Client/Fund: CECI/CBED, CECI/CHI

Year: 1999

Service Amount: Npr. 525,000.00

Workshop for Strategy Development for Sanitation Packages for Pit Latrine, Hygiene Education and Water Quality

Working Areas: Bara, Rautahat

Client/Fund: Plan International Nepal, Bara/Rautahat Program

Year: 1999

Service Amount: Npr.127,000.00

Construction Quality Assessment of Water Supply and Sanitation Program

Working Areas: Bara, Rautahat

Client/Fund: Plan International Nepal, Bara/Rautahat Program

Year: 1999

Service Amount: Npr. 227,000.00

Detail Feasibility Study with complete design package for 66 DWS Projects in 11 VDCs of Nuwakot District

Working Areas: Nuwakot District

Client/Fund: DWSO Nuwakot

Year: 1998/1999

Service Amount: Npr. 287,000.00

7 Days Technical Training on Improvement of Water and Sanitation Project to NGOs Engineer/Overseers of Dadeldhura, Baitadi, Jumla

Working Areas: Dadeldhura, Baitadi, Jumla

Client/Fund: CECI/CBED, CECI/CHI

Year: 1998

Service Amount: Npr. 187,000.00

Feedback Session for Engineers/Overseers of Dadeldhura, Baitadi, and Jumla in Construction Quality Improvement (Four Packages)

Working Areas: Dadeldhura, Baitadi, Jumla

Client/Fund: CECI/CBED, CECI/CHI

Year: 1998

Service Amount: Npr. 400,000.00

Detail Pre-Feasibility Study with complete design package for new 16 Drinking Water Supply Projects in Dadeldhura District

Working Areas: Dadeldhura District

Client/Fund: CECI/CBED, CECI/CHI

Year: 1998

Service Amount: Npr. 300,000.00 

Detail Feasibility Study with complete Design Package for 125 DWS Projects in Dadeldhura, Baitadi, and Jumla

Working Areas: Baitadi, Jumla, Dadeldhura District

Client/Fund: CECI/CBED, CECI/CHI

Year: 1997/1998

Service Amount: Npr. 725,000.00

VDC Water Resource Mapping and Sanitation Profile of 9 VDCs in Dadeldhura, 8 VDCs in Baitadi District and 16 VDCs in Jumla

Working Areas: Dadeldhura, Baitadi, Jumla

Client/Fund: CECI/CBED, CECI/CHI

Year: 1997

Service Amount: Npr. 330,000.00

Detail Feasibility Study with Complete Design Package for 25 Micro-Irrigation Project in Dadeldhura, Baitadi, and Jumla District

Working Areas: Dadeldhura, Baitadi, Jumla

Client/Fund: CECI/CBED, CECI/CHI

Year: 1997

Service Amount: Npr. 200,000.00

Socio-Economic Analysis of DWS/Irrigation for 150 Projects in Dadeldhura, Baitadi and Jumla District

Working Areas: Dadeldhura, Baitadi, Jumla

Client/Fund: CECI/CBED, CECI/CHI

Year: 1997

Service Amount: Npr. 200,000.00

Construction Quality Monitoring Work of 80 Water Projects in Dadeldhura, Baitadi, and Jumla District

Working Areas: Dadeldhura, Baitadi, Jumla

Client/Fund: CECI/CBED, CECI/CHI

 Year: 1997/1999

Service Amount: Npr. 1,000,000.00

14 Days Plumbing Training to Community Workers for Community Based Water Projects of Jumla, Dadeldhura and Baitadi (4 Packages)

Working Areas: Dadeldhura, Baitadi, Jumla

Client/Fund: CECI/CBED, CECI/CHI

Year: 1997/1999

Service Amount: Npr. 700,000.00

21 Days Ferro cement Mason Training to Community Workers for Community Based Water Projects of Dadeldhura ad Baitadi (4 Packages)

Working Areas: Dadeldhura, Jumla

Client/Fund: CECI/CBED, CECI/CHI

Year: 1997/1999

Service Amount: Npr. 500,000.00

One month Stone Masonry/Dakarmi Training to Community Workers for Community Water Projects of Jumla, Dadeldhura and Baitadi (4 Packages)

Working Areas: Dadeldhura, Baitadi, Jumla

Client/Fund: CECI/CBED, CECI/CHI

Year: 1997/1999

Service Amount: Npr. 500,000.00